EBAY ITEM 110555697732
We no longer have that item for sale, but check out our current eBay listings. Don't forget to join the mailing list and keep in touch.
GATES MASTERFLEX 300 EPDM
GATES INDUSTRIAL PART NUMBERS: GAT 7744-5201, GAT 7744-5202, GAT 7744-5203, GAT 7744-5204, GAT 7744-5205, GAT 7744-5206, GAT 7744-5207, GAT 7744-5208. See the complete Gates Catalog for more products. Call or send us a fax to process your orders.
HANSEN SERIES HK ISO B 45 SERIES QD COUPLERS
Hansen HK Series quick disconnect couplers are equal to Aeroquip FD45 Series and Gates G94511/G94521. "Series HK Couplings are the most versatile couplings available and are suitable for use with various liquids, chemicals, steam, gases and vacuum. Series HK couplings conform to the dimensional requirements of ISO 7241-1 Series B. Body sizes range from 1/8 [inch] to 1 [inch]." Source: Hansen QD Coupling Catalog, 2010, pp. 46. Updated 10:49 PM 6/24/2010.
JACKHAMMER HOSE ASSEMBLY
SPECIAL PROMO MAY 1ST TO JUNE 30, 2010
RECEIVE 40% DISCOUNT FOR ORDERS OF 10 UNITS OR MORE OFFER GOOD UNTIL SUPPLIES LAST OR UNTIL DEADLINE, WHICHEVER COMES FIRST. REGULAR PRICE 120.00 USD PART NO U HJKCT070. REF BULLETIN 75.
LM 1500 SERIES 10 MW GAS POWERED ELECTRIC GENERATOR
Product Overview GAS TURBINE Model: LMA
1500.
PERFORMANCE (ISO Conditions)
Power Turbine Speed: 5500 rpm
GAS TURBINE SPECS
1.00 Equipment List 1.01 Standard Equipment 1.02 Optional Equipment 1.10 Installation Requirements 1.20 Purchaser's Responsibilities 1.30 Acceptance Test 1.40 Performance Rating Specifications
1.00 EQUIPMENT LIST 1.01 Standard Equipment
1.0.2 Optional Equipment
1.10 INSTALLATION
REQUIREMENTS Reliable operation
and low maintenance costs for the gas turbine require that the purchaser installation
designs and operating/maintenance practices be in accordance with the instructions
defined in the then-current Installation Design Manual and the Operation
and Maintenance Manual. 1.20 PURCHASER'S
RESPONSIBILITIES It is to be recognized that the purchaser has system responsibility for technical integration of the LMA 1500 gas turbine into a complete gas turbine system, satisfying the installation/interface requirements and recommended operation/maintenance practices defined in the then-current Installation Design Manual and Operation and Maintenance Manual. The purchaser's attention is specifically referred to, but not limited to, such system interfacing consideration s as vibration, controls, fuel quality, inlet air quality, inlet system design and construction, and gas turbine cooling. 1.30 ACCEPTANCE TEST Each gas turbine is tested at LM Alternatives test facility to verify proper mechanical operation and compliance with guarantee performance levels. Testing is in accordance with LM Alternatives established practice for industrial gas turbines. Measurements at five test data points, spanning the entire power range, are taken to establish shaft horsepower and heat rate. Test data is corrected to the guarantee conditions. Upon completion of the test, a formal Test Acceptance Report, including copies of all original test log and data sheets, is issued by Engineering. 1.40 PERFORMANCE RATING
Power turbine
rate: 5,500
rpm.
Emission levels for
power levels between 75% and 100% of base load. Updated January 2000. |
AUTOCLAV OVEN VACUUM HOSE ASSEMBLY
GATES 27453 GAS PUMP HOSE
GATES 27453 SOFTWALL GAS PUMP HOSE 3/4 IN ID 12MP 12MP 14 FT OAL. UPDATED JAN 2010. PRICE 170.00 USD